7-projects
Projects
DSD Contract No. DC/2005/09

Drainage Improvement Works in Tai Po Urban Areas

Client : Drainage Services Department

Period : 2005-2009

Peako teamed up with China Harbour to form a Joint Venture which was awarded the contract for Drainage Improvement Works in Tai Po Urban Areas. Key deliverables included :

  • Construction of approximately 2.6 kilometers of drains, including box culvert by open cut method;
  • Construction of approximately 300m of drains by trenchless method;
  • Construction of a floodwater pumping station besides Lam Tsuen River and Installation, testing, and commissioning of the associated pumping equipment and E&M works; and
  • Installation of 9 nos. of flap valves at the outfalls along Lam Tsuen River and landscape works.