HyD Contract No. HY/2016/06

Lift and Pedestrian Walkway System at Cheung Hang Estate, Tsing Yi

Client : Highways Department

Period : 2017-2020 (in Progress)

 

Concentric was awarded a competitive contract by HyD, Key deliverables included the construction of :  

  • Construction of al lift tower with two lifts and staircase of about 31 metres in height at Tsing Yu Street;
  • Construction of a covered elevated walkway with a clear width of about 3.3m and of about 60m in length, connecting the above lift tower to the footpath along the southbound carriageway of Tsing Yi Road West;
  • Construction of a lift tower with single lift of about 13 m in height at the wastern side of the existing footbridge (No. NF230) across Tsing Yi Road West;
  • Widening of a section of footpath of about 30 m in length to about 3.5 m along the south bound carriageway of Tsing Yi Road West between the proposed elevated walkway and the existing footbridge (No. NF230) across Tsing Yi Road West; and
  • Ancillary works, including associated road, drainage, slope and geotechnical, utilities, public lighting, landscaping, electrical and mechanical (E&M) works, etc.