Kai Tak Development - Kai Tak Approach Channel & Kwun Tong Typhoon Shelter Improvement Works (Phase 1)
Client : Civil Engineering and Development Department
Period : 2011-2015
Kai Tak Development - Kai Tak Approach Channel & Kwun Tong Typhoon Shelter Improvement Works (Phase 1)
Client : Civil Engineering and Development Department
Period : 2011-2015
Concentric teamed up with Penta-Ocean and Alchmex to form a Joint Venture and secured the contract for the Kai Tak Approach Channel and Kwun Tong Typhoon Shelter Improvement Works (Phase 1).
Key deliverables of the works included :
The project team successfully designed a closed grab mounted on hydraulic excavator for dredging to alleviate pollution to the channel water during removal of contaminated sediments and an innovative geotextile containment capable to carry 300m3 sediments with venting ports to prevent bursting caused by impacts due to the free fall from the marine vessel to the sea bed.