CEDD Contract No. KL/2015/02

Kai Tak Development – Stage 5A Infrastructure at Former North Apron Area

Client : Civil Engineering and Development Department

Period : 2016-2021 (in progress)

Peako - Wo Hing Joint Venture was awarded a competitive contract by CEDD for the Kai Tak Development Stage 5A. Key deliverables included the construction of :  

  • A single two-lane Road L7 of about 140 m long and a section of dual two-lane Road D1 of about 470 m long connecting with Concorde Road;
  • A single-lane slip road S15 of about 160 m long linking the proposed Road D1 with existing flyover K72 for connection with PERE eastbound;
  • A pedestrian subway SW6 of about 120 m long across PERE connecting the future preservation corridor for the Lung Tsun Stone Bridge remnants in KTD and Shek Ku Lung Road Playground;
  • Associated footpaths, street lighting, traffic aids, drainage including about 830 m long box culverts, sewerage, water mains, landscaping and ancillary works; and
  • Implementation of environmental mitigation measures and related EM&A programme.