Sinopec Chai Wan Jetty Restoration Works

Sinopec Chai Wan Jetty Restoration Works

Client : SINOPEC (HONG HONG) LIMITED

Period : 2015-2016

The key deliverables of the Contract included:

  • demolition (including pile cutting at the seabed), breaking and disposal of demolished materials for Dolphins 3 and 4;
  • demolition, breaking and disposal of demolished materials for Walkways WB1 and WB2 (including all pipeworks, F.S. installation, equipment and fitting, pipe bridges etc);
  • removal of walkways from the seabed, breaking and disposal of demolished materials for Walkways WB3 and WB4;
  • re-construction of Dolphins 3 and 4 including bored piles, rock sockets, pile cap and associated facilities on the dolphins;
  • supply and installation of bollards, fenders (including rubber fenders, frontal pads and associated fixings) and any other facilities given on Drawings and Specifications;
  • fabrication and installation of precast walkways (WB1 to WB4) including pipe bridges;
  • seabed survey and clearance of debris at seabed after construction; and
  • all other works shown on the Drawings and in the Specifications.