Drainage and Sewage
DSD Contract No. DC/2005/09
Client
Drainage Services Department
2005-2009
Peako teamed up with China Harbour to form a Joint Venture which was awarded the contract for Drainage Improvement Works in Tai Po Urban Areas. Key deliverables include :
- Construction of approximately 2.6 kilometers of drains, including box culvert by open cut method;
- Construction of approximately 300 m of drains by trenchless method;
- Construction of a floodwater pumping station besides Lam Tsuen River and Installation, testing, and commissioning of the associated pumping equipment and E&M works; and
- Installation of 9 nos. of flap valves at the outfalls along Lam Tsuen River and landscape works.