Projects

Projects

Drainage and Sewage

DSD Contract No. DC/2005/09

Drainage Improvement Works in Tai Po Urban Areas

Client

Drainage Services Department

2005-2009

15
13
06
15a

Peako teamed up with China Harbour to form a Joint Venture which was awarded the contract for Drainage Improvement Works in Tai Po Urban Areas. Key deliverables include :

  • Construction of approximately 2.6 kilometers of drains, including box culvert by open cut method;
  • Construction of approximately 300 m of drains by trenchless method;
  • Construction of a floodwater pumping station besides Lam Tsuen River and Installation, testing, and commissioning of the associated pumping equipment and E&M works; and
  • Installation of 9 nos. of flap valves at the outfalls along Lam Tsuen River and landscape works.