DSD Contract No. DC/2005/07

North and South Kowloon Sewerage Stage 2

Client

Drainage Services Department

2005-2009

IMG_6556
DC2005-12_2008April-09
090119-GR DSCN3129
DSCN1347
DSCN1838

Peako was awarded a competitive contract by DSD for the South Kowloon Sewerage Stage 2 Improvement Works. Key deliverables include the construction of :

  • Approximately 580 metres long sewer ranging from 525 mm to 600 mm diameter in Hung Hom including a section of about 65 metres sewer to be constructed using trenchless method along San Lau Street crossing Chatham Road North; and
  • Approximately 1070 metres long sewer ranging from 375 mm to 675 mm diameter in Kowloon City including a section of about 60 m sewer to be constructed using trenchless method along Grampian Road crossing Nga Tsin Wai Road.