Sinopec Chai Wan Jetty Restoration Works

Sinopec Chai Wan Jetty Restoration Works

Client

SINOPEC (HONG HONG) LIMITED

2015-2016

DJI_0028
DJI_0021
IMG-20160229-WA0000
IMG_7293
IMG-20170215-WA0014
IMG-20170215-WA0023
Photo from T S Lam

The key deliverables of the contract include :

  • Demolition (including pile cutting at the seabed), breaking and disposal of demolished materials for Dolphins 3 and 4;
  • Demolition, breaking and disposal of demolished materials for Walkways WB1 and WB2 (including all pipeworks, F.S. installation, equipment and fitting, pipe bridges etc);
  • Removal of walkways from the seabed, breaking and disposal of demolished materials for Walkways WB3 and WB4;
  • Re-construction of Dolphins 3 and 4 including bored piles, rock sockets, pile cap and associated facilities on the dolphins;
  • Supply and installation of bollards, fenders (including rubber fenders, frontal pads and associated fixings) and any other facilities given on Drawings and Specifications;
  • Fabrication and installation of precast walkways (WB1 to WB4) including pipe bridges;
  • Seabed survey and clearance of debris at seabed after construction; and
  • All other works shown on the Drawings and in the Specifications.