Port Works

Installation of Upgrade Bollards at Container Terminal 8

Installation of Upgraded Bollards at Terminal 8 West

Client

Asia Container Terminals Ltd.

2014-2015

IMG_20150522_112852
20141107 (77)
20141121 (38)
20141126 (2)
20141129 (1)a

The Works include the following :

  • To supply and install 25 nos. of 100 and 150 tons “Richards Marine” SG Iron marine bollards (CVCV100B and CVCV150) at Berth 13 and Berth 14 in ACT Terminal 8 (West), including the removal of the existing 25 nos. of 50 tons marine bollards; and
  • To carry out all other necessary reinstatement works for the completion of the bollard upgrading works.