Roads and Bridges
TDD Contract No. TP35/02
Client
Penta-Ocean Construction Co. Ltd.
2003-2004
Concentric was selected to construct two pedestrian subways for part of the engineering works for Pak Shek Kok Development. The subways were built below tidal water level in the land formed by reclamation. Working sequence had to be carefully planned to overcome the tidal effect.