VTC Contract Slope Stabilization Works at Hiu Ming Street, Kwun Tong

Slope Stabilization Works for Hong Kong Institute of Vocational Education (Kwun Tong) at Hiu Ming Street, Kwun Tong, Klowloon - K.T.I.L. 709  

Client

The Hong Kong Institute of Vocational Education

2015-2018

151202_111104
151228_DSCN2142
160111_DSCN2219
160111_DSCN2220
20170220_152457_HDR
160308_DSCN2416
20170220_154544_HDR

Concentric was commissioned by HKIVE to carry out slope stabilization works at Kwun Tong IVE. Key deliverables include the construction of :

  • Soil nail / rock dowels / rock sockets / rock anchors, construction of reinforced concrete soil nail heads and cutting and filling of slopes;
  • Surface treatment to slopes with hydroseeding, erosion control mat, wire mesh with fixing pins;
  • Hot dip galvanised mild steel hand railing to maintenance staircases;
  • Site drainage works;
  • Inspection and repair of all existing surface drainage system including surface channels, catch pits, sand traps and weep holes on existing slopes within proposed slope works limit and to provide temporary drainage for surface water throughout the contract period in clean functional order until completion of the Works; and
  • Supplementary ground investigation works to verify the existing soil / rock profiles and underground water tables.