Projects

Projects

Roads and Bridges

HyD Contract No. HY/2020/08

Flyover from Kwai Chung Interchange Upramp to Kwai Chun Road

Client

Highways Department

2021-2025

231115_KTIC_051
231115_KTIC_048
231115_KTIC_044
231115_KTIC_026
231115_KTIC_017
231115_KTIC_012
231115_KTIC_061
IMG-20221210-WA0120
IMG-20221211-WA0004
IMG-20221211-WA0027
IMG-20221211-WA0030

The works mainly include:

  • Construction of any approximately 370 meters(m) long single-lane vehicular bridge between the southbound fast lane of Tsuen Wan Road (near Kwai Tsing Interchange upramp) and Kwai Chung Road;
  • Widening of an approximate 85m long section of the southbound traffic lane of Tsuen Wan Road between Kwai Tsing Interchange upramp and Kwai Chung Road;
  • Construction of noise barriers at the vehicular bridge as stated in (i) above
  • Demolition and reprovisioning of the existing Footbridge NF303, and provisioning of lifts;
  • Relocation of bus stop next to Footbridge NF303 and associated footpath modification works;
  • Reconstruction of sections of Kwai Chung Road and Container Port Road South; and
  • Ancillary works including public lighting, drainage, landscaping and environmental mitigation measures.