HyD Contract No. HY/2016/06

Lift and Pedestrian Walkway System at Cheung Hang Estate, Tsing Yi  

Client

Highways Department

2017-2020 

WhatsApp Image 2019-11-05 at 17.21.58
WhatsApp Image 2019-11-14 at 09.15.42
WhatsApp Image 2020-02-17 at 10.17.14
IMG_1666
190921-CHTY-063 (NF230A)
200229-WA0007 (Opening of NF230B)
200307-CHTY-050
200307-CHTY-022
200307-CHTY-083
200626_CHTY_320
200626_CHTY_364

Concentric was awarded a competitive contract by HyD. Key deliverables include the construction of :  

  • A lift tower with two lifts and staircase of about 31 metres in height at Tsing Yu Street;
  • A covered elevated walkway with a clear width about 3.3m and about 60m span, connecting the above lift tower to the footpath along the southbound carriageway of Tsing Yi Road West;
  • A lift tower with single lift of about 13 m in height at the wastern side of the existing footbridge (No. NF230) across Tsing Yi Road West;
  • Widening of a section of footpath about 30 m in length to about 3.5 m width along the south bound carriageway of Tsing Yi Road West between the proposed elevated walkway and the existing footbridge (No. NF230) across Tsing Yi Road West; and
  • Ancillary works, including associated road, drainage, slope and geotechnical, utilities, public lighting, landscaping, electrical and mechanical (E&M) works, etc.